ODP logging contractor: LDEO-BRG Hole: 1134A Leg: 182 Location: Great Australian Bight (SW Pacific Ocean) Latitude: 33° 31.7244' S Longitude: 127° 15.8400' E Logging date: December, 1998 Bottom felt: 713 mbrf Total penetration: 1110.1 mbsf Total core recovered: 195.4 m (49.4 %) VSP TOOL USED: WST (Well Seismic Tool) Acquisition Break Time: Time between start of recording and first break Acquisition Transit Time: Time between shot firing (as recorded by blast phone) and first break. The shot is fired ~12 milliseconds after start of recording. The difference between Acquisition Break Time and Acquisition Transit Time is not constant and varies for each shot. VSP STACKS SUMMARY LISTING (one-way transit times) DEPTH ACQUISITION_ ACQUISITION_ ACQUISITION_ (mbsf) SHOT_TIME BREAK_TIME TRANSIT_TIME (s) (s) 382.0 03-12-1998:06:01:00 0.71858 0.648273 349.1 03-12-1998:06:06:59 0.70531 0.635017 299.1 03-12-1998:06:14:00 0.683951 0.613636 259.0 03-12-1998:06:21:29 0.667138 0.596854 199.0 03-12-1998:06:30:13 0.639874 0.569557 169.1 03-12-1998:06:36:43 0.625319 0.554 139.0 03-12-1998:06:44:28 0.609571 0.539228