Hole preparation (including flush with sepiolite) complete, rig wireline. |
|
Run geophysical tool string into hole. | |
|
|
Reach bottom of hole. |
|
Finish uplog at 274 m/hr from 1034 mbsf to 679 mbsf. | |
|
Resume logging at 163 mbsf below base of pipe. | |
|
Finish uplog at 274 m/hr from 163 mbsf to 16 m above seafloor. Pull out of hole. | |
|
Recover geophysical tool string, begin preparing FMS/Sonic tool string. | |
|
Run FMS/Sonic tool string into hole. | |
|
Reach bottom of hole. Start uplog from 1033 mbsf. | |
|
Tool string goes dead at 948 mbsf; reinitialized and run back to bottom of hole. | |
|
Finish uplog at 274 m/hr from 1033 to 690 mbsf. Lower toolstring for second pass. | |
|
Finish second uplog at 274 m/hr from 1033 to 975 mbsf. Pull out of hole. | |
|
FMS/Sonic tool string on deck. |